We’ve been part of the Magical Bridge project for the last five years and we’re thrilled that it’s now in the final stages of construction! Join us on April 18 for the Grand Opening of this fun, inclusive, and gorgeous playground. Here, the two-story playhouse and theater is getting some…
Read MoreYou’ll need both a secret password and solid climbing skills to get into this clubhouse! Start by making your way down the steep hillside with the help of a massive rope. If you’re up for yet another challenge, test out the climbing wall and you’ll end up at an…
Read MoreHere’s the scene: A gorgeous new treehouse sits perched atop a live oak, tucked into a pocket of a lucky kid’s backyard. The colors are crisp; the ladders and secret doors and zip lines stand ready to elicit giggles, shrieks or shouts of joy. While it might appear to a…
Read MoreDay 5 on site at the Contra Costa Jewish Day School and great progress! The Tube Slide has been installed and the rubber resilient surface material (RSM) has been poured by Playgrounds Unlimited.Here, Sean from playgrounds Unlimited, checks to make sure that the RSM is 2-1/2″ thick, the required thickness…
Big Day on site: the crawl tunnel tube is added in between Clubhouse #1 and Clubhouse #2! They will keep it wrapped in plastic sheeting until everything else on site is done, but this fun play element is in place and just waiting for kids to crawl through it. Next…
Read MoreI thought it would be nice to take a few minutes and share a custom play structure installation we finished over a year ago. When I came across these photos, it made me smile! We had a great installation in Pasadena. Meet the crew: James getting ready to install the…
Day 2 the crew continues with the installation of Contra Costa Jewish Day School’s play structure:
Now that the ledgers have been installed (see Day 1) the guys bring in the clubhouse floor framing, bolting the frames to the ledgers…
Barbara and crew are back on site at the Contra Costa Jewish Day School playground where they are installing a public use, fully enclosed, ADA Handicap Accessible play structure custom designed to run above the playground on top of existing 8′ high concrete pla…
Read MoreThe day before we arrive, the school yard sits empty, waiting for the magic to begin…
During the initial design process, Barbara, Jeff & Marco spend a day doing a “stick-out” on site, using rough strips of wood to layout the shape of the Clubhouse on the hillside.
Read MoreThe crew returned on Friday to finish the details, pack up all of our tools & materials, and apply a final coat of tung-oil to the play structure. We were right on schedule and just in time – the client was having a huge party with 150 guests on Saturday to celebrate the 4th of July.
It takes strength, agility and team work to put a roof up on a 2-story play set. Barbara, the overseer (and also referred to as the “clucker”) documented the process with her camera while keeping watch and making sure all went safely & smoothly…
Back on site early the next morning the crew enjoys the beautiful view, then gets to work adding the corner Slide Deck to the Big Deck. Barbara is standing up the hill, amongst the trees, to take this photo:
Castle Play Structure: Everything is built and the site is ready! Barbara does a quick layout inside the newly graded space to verify that the play structure, with appropriate Use Zone, will still fit…
FINAL DAY on site!Marco & Will spend the morning adding the play accessories:pulley bucket, rock holds, drop leaf table & 2 drop benches, top secret wall safe, chalkboard, shelf & pegs set, and lots & lots of Long Island road signs! Then break for yoga exercises on the lawn! Meanwhile,…
FINAL DAY on site!Marco & Will spend the morning adding the play accessories:pulley bucket, rock holds, drop leaf table & 2 drop benches, top secret wall safe, chalkboard, shelf & pegs set, and lots & lots of Long Island road signs! Then break for yoga exercises on the lawn! Meanwhile,…
Read MoreThe guys start out the day digging post holes. adding knee braces… breaking for watermelon (Jeff was hoping to keep it for himself) Laying the deck boards and lifting the walls into place! At dusk, head back in Will’s “Fit” to the very cute little house rented for the week…
INSTALLATION: Day 1 The first day on site for a treehouse installation is all about positioning the girder box followed by the deck frame up in the tree. Placing of the girder box dictates the fit of the treehouse and how well the rest of the installation will go! The…
Read MoreHalf-way through installation, the Rocket Ship is starting to look exactly like Barbara’s artist sketch!
Read MoreWill Pratt: Expert Builder/InstallerDuties: – Fabricates treehouses & play structures– Travels to sites & participates in installations– Keeps everyone amused with anticsAbout Will:– 2nd youngest crew member– Recently moved to Brooklyn, NY with his girlfriend– but still signs on for East Coast Installations– Plays Banjo / member of Jazz band–…