Long Island Treehouse: Day 4 Install

FINAL DAY on site!


Marco & Will spend the morning adding the play accessories:
pulley bucket, rock holds, drop leaf table & 2 drop benches, top secret wall safe, chalkboard, shelf & pegs set, and lots & lots of Long Island road signs!

Then break for yoga exercises on the lawn!

Meanwhile, Barbara’s up in the Clubhouse putting the finishing touches to the interior…

IMG_6358.jpg

The interior is bright and sunny (the walls are stained wild orange) and loaded with play accessories:

  • Chalkboard

  • Shelf & pegs

  • Flags on hook

  • Shield (that slides open to reveal secret safe combination)

  • Top Secret Safe

  • Drop leaf table & drop seats

And all the hand-carved & stained signs are attached to the walls…

Peek thru the door: the tree grows up thru the deck & partially hides the entrance…

The finished tree house blends into the the surroundings without a hint of the color explosion inside.

IMG_6372.jpg


The tree house clubhouse from different views…

Pulley bucket


Rung ladder to Clubhouse interior

Rock holds on the footing post

Dusk approaching – time to leave…

A few crew shots for the photo albums…

Walking away from another great job! Everyone feels lucky to be able to work on a tree house!


Will heads back to Brooklyn (our East Coast man)

Marco loads up the truck – on to the next job!